January 27, 2009

Progress in the Bathroom

Posted in Home Improvement, Uncategorized at 5:13 am by bethmillett

So, the work on the master bath is a little slower than expected, but I’m moving at lightning pace compared to the previous year and a half. I started tiling this past weekend and hope to be finished by Saturday. Here are some update photos:

The tub alcove before I got started.

The tub alcove before I got started.

The new framing and the tub installed, about March 2008

The new framing and the tub installed, about March 2008

The cement backerboard almost completely installed, about November 2008.

The cement backerboard almost completely installed, about November 2008.

bath6_7pm

Most of the tile dry-fitted and ready for actual installation.

On Sunday night after the last photo, I did install the upper half of the two short walls, and last night after work I did the lower half of one wall, and the row of bullnose tile that follows the edge of the ledges. Hopefully tonight after work I can muster up the energy to finish the installation. Then I can grout on Saturday morning and use the shower on Sunday!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.